For this week, I was assigned to texture ufo and tent as well as fix them their uvs if they're not fixed before texturing. Texturing the ufo was done without a hitch but when I got to the tent, there were a lot of problems with it, namely n-gons. I spent a lot time trying to fix it such as adding more edge loops, connecting faces that weren't conneted but everything I did just added more n-gons and problems. After about 3 hours, I realize it was beyond saving to I started a new one, which took less time. Goes to show that sometimes the best solution is starting from scratch. Also, I lost a couple of days going to New York for a job interview.
Pros:
finsihed ufo
Cons:
interviews
wasted time on wrong solution
Hours:
uv and texturing ufo: 2 hours
fixing original tent: 3 hours
creating new tent: 1 hours
total hours: 6