Game Development and Gant Draft
Game Development (2 hrs)
I was working on adding the score and timer to the program which I had left from my Greybox for Refueled. I also made it so that humans can now steal fuel from the Aliens via a simple script. I had trouble finding the right way to do the timer and the score. The game ends immediately and I wasn't exactly sure how to change the timer to end appropriately. I also added the game to the game selector for testing purposes next week.
Gant Draft (4 hrs)
I created the Gantt Draft based on existing tasks in Trello. John and I started by trying to export and import in GanttProject to make life easier. This was incredibly difficult because Trello won't export as a CSV in the free version. The free version gave us a JSON which I converted to a CSV using a converter which caused some information to be lost in translation. We moved on to doing it by hand to save time instead of attempting to get a failing import in. By hand worked quite well until Gantt Project class. I had saved semi-frequently but unbeknownst to me, I was saving in a file that I did not have write access to. I then ran home and re-did the entire Gant draft by hand.
Positive Content: Once I figure out the issue with the timer then Refueled is done in time for the next build. The Gant chart is done.
Negative Content: The weather caused a lot of problems and I had a bad allergic reaction so I couldn't really work when this was occurring. I also hit confusion with the Timer script. GanttProject was not the best and made working with it a challenge.
Total Hours: 6